Rehabilitation of the DN600 sewer system on Av. Boyacá using CIPP UV technology
Location: Av. Boyacá with Calle 26 – Bogotá
The challenge
The work was carried out on a 24-inch main sewer line located under Avenida Boyacá, one of the busiest roads in Bogotá, where open trench excavation was not feasible. The initial CCTV inspection revealed joint displacements and structural deterioration, necessitating structural rehabilitation using trenchless technology.
Project conditions
Access to the collector was achieved through deep wells with high water flow and a significant presence of material within the system, which created complex operating conditions for the execution of the project.
[Insert image of the well with high flow and material]
Solution implemented
The rehabilitation was carried out using CIPP sleeve with UV curing, creating a new structural pipe within the existing conduit and correcting the irregularities of the system.
|
Parameter |
Worth |
|
Diameter |
600 mm |
|
Liner thickness |
8 mm |
Network status
|
BEFORE – Existing network |
AFTER – Rehabilitated network |
|
|
Uniform internal section and structural continuity |
State of the boards
|
BEFORE – Displaced joints |
AFTER – Corrected joints |
|
[Insert image of displaced joints] |
[Insert image after CIPP] |
Installation process
[Insert continuous photo gallery of the installation process]
Results
✔ Complete structural rehabilitation of the DN600 collector
✔ Correction of displaced joints
✔ Improved hydraulics of the system
✔ Intervention without excavation on main road
✔ Implementation without affecting traffic on Boyacá Avenue